Retro Specialty Contractors performed concrete repair and FRP installation on the underside of the Burrard Bridge for two different General Contractors over a period of 5 years. FRP was applied to the underside of the bridge structure.
City of Vancouver
Graham Construction
2016-2018
Seismic 2000 Construction
2013-2014